Rio Grande Basin Initiative

2010-11 Deliverables

Task 5 Research
Principal Investigator(s): Bruce Lesikar

We mutually agree for Bruce Lesikar to deliver the following during the period of July 1, 2010 to June 30, 2011 using funds from the Rio Grande Basin Initiative:

  1. Determine lateral run lengths of drip irrigation tubing for rainwater harvesting system applications utilizing gravity pressure.
  2. Evaluate various parameters of water quality from multiple demonstration sites which are used for irrigation.
  3. Test how various tank colors and shading affect the quality of the water within a rainwater harvesting system used for irrigation.
Back to Top