Rio Grande Basin Initiative

2002-03 Deliverables

Task 1 Research
Principal Investigator(s): Zhuping Sheng

  1. Develop the testing schedule and plans in collaboration with El Paso County Water Improvement District No. 1 and and Elephant Butte Irrigation District, USBR and NMSU.
  2. Conduct 20 flow current measurements to assess seepage losses within the El Paso County Water Improvement District NO. 1 (EPCWID#1) by October 2002.
  3. Conduct 3 to 5 canal ponding tests to measure seepage losses in EPCWID#1 by May 2003.
  4. Prepare two technical reports on current meter measurements and ponding tests by May 2003.
  5. Prepare 1 or 2 papers for publication.